Hestan KDW24-OV Installation Manual Page 14

  • Download
  • Add to my manuals
  • Print
  • Page
    / 36
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 13
A
A
Place the provided template on the inner surface of the overlay panel. Center the template
on the panel and align it with the top edge, matching up the reference locators (A ). . Mark
the position of the door hooks with a pencil. Remove the template and use a drill with a
suitable bit to carefully make holes at the points marked on the panel. Using a Phillips
screwdriver, secure the door hooks with the 8 supplied screws at the marked reference
©2018 Hestan Commercial Corporation
12
MOUNTING THE OVERLAY DOOR PANEL
(KDW24-OV MODEL)
Drill the holes for the overlay panel handle using a drill with a suitable bit. Attach the
door handle before securing the panel to the dishwasher (screws for mounting the handle
are not provided).
1
2
Attach the door panel by fitting the hooks into their slots on the dishwasher and carefully
slide the panel downwards and securely into place.
points.
Make sure the dishwasher door, complete with panel, opens without restrictions.
LOCATION AND INSTALLATION
(continued)
EN
Page view 13
1 2 ... 9 10 11 12 13 14 15 16 17 18 19 ... 35 36

Comments to this Manuals

No comments